Proofreading + proper citation and link styles + additional link |
m Text replacement - "Colonial Fleet (RDM)" to "Colonial Fleet (TRS)" |
||
Line 1: | Line 1: | ||
'''PPDIOO'''<ref>[http://imgur.com/6VvkXZP Screen capture of PPDIOO report as seen in "Razor"]</ref> is a network lifecycle continuous/continual improvement process ([[w:Continual_improvement_process|CIP]]) implemented by the [[Colonial Fleet ( | '''PPDIOO'''<ref>[http://imgur.com/6VvkXZP Screen capture of PPDIOO report as seen in "Razor"]</ref> is a network lifecycle continuous/continual improvement process ([[w:Continual_improvement_process|CIP]]) implemented by the [[Colonial Fleet (TRS)|Colonial military]]. | ||
Admiral [[Helena Cain]] reviews a summary report on PPDIOO's implementation and other topics related to ship and crew status, while the [[Mercury_class_battlestar|battlestar]] [[Pegasus (TRS)|''Pegasus'']] is docked at the [[Scorpion Fleet Shipyards]] for a large-scale overhaul. The overhaul includes the ship's network infrastructure, an effort that is led by [[Gina Inviere]] of [[Integral Systems Engineering]] ([[TRS]]: "[[Razor/Full Article|Razor]]"). | Admiral [[Helena Cain]] reviews a summary report on PPDIOO's implementation and other topics related to ship and crew status, while the [[Mercury_class_battlestar|battlestar]] [[Pegasus (TRS)|''Pegasus'']] is docked at the [[Scorpion Fleet Shipyards]] for a large-scale overhaul. The overhaul includes the ship's network infrastructure, an effort that is led by [[Gina Inviere]] of [[Integral Systems Engineering]] ([[TRS]]: "[[Razor/Full Article|Razor]]"). |
Latest revision as of 00:49, 13 March 2023
PPDIOO[1] is a network lifecycle continuous/continual improvement process (CIP) implemented by the Colonial military.
Admiral Helena Cain reviews a summary report on PPDIOO's implementation and other topics related to ship and crew status, while the battlestar Pegasus is docked at the Scorpion Fleet Shipyards for a large-scale overhaul. The overhaul includes the ship's network infrastructure, an effort that is led by Gina Inviere of Integral Systems Engineering (TRS: "Razor").
Notes
- PPDIOO (Prepare, Plan, Design, Implement, Operate, and Optimize) is also a network lifecycle implementation and optimization procedure defined by the networking corporation Cisco.
- The short glimpse of the term in Pegasus' report seems to be the only occurrence throughout the continuity.