Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Editing Road Work on Colonial 5 Nears Completion

From Battlestar Wiki, the free, open content Battlestar Galactica encyclopedia and episode guide
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision Your text
Line 2: Line 2:


== Story ==
== Story ==
After almost two years, and close to one million [[Cubit|cubits]] of the city's tax dollars, roadwork on [[Colonial Highway 5]] is finally nearing completion.  What was once a road paved with low-grade asphalt and filled with potholes, is now a state-of-the-art roadway.  "Though the repairs have taken longer than expected, we're extremely pleased with the results," said [[Althea Erasmus]] from the City of Caprica Department of Public Works "and we think the citizens will be, too."   
After almost two years, and close to one million cubits of the city's tax dollars, roadwork on Colonial Highway 5 is finally nearing completion.  What was once a road paved with low-grade asphalt and filled with potholes, is now a state-of-the-art roadway.  "Though the repairs have taken longer than expected, we're extremely pleased with the results," said Althea Erasmus from the City of Caprica Department of Public Works "and we think the citizens will be, too."   


The repairs included a thorough re-paving, new guard rails, and a widening of the roadway in some areas.  And with only three days work ahead left to go, the repair team at the DPW is ready to celebrate.  "Though [[Storm of the Century Hits Caprica|that storm]] a while back slowed us down by a good month or so, we're finally in the home stretch," said longtime DPW worker [[Jonas Malkas]].   
The repairs included a thorough re-paving, new guard rails, and a widening of the roadway in some areas.  And with only three days work ahead left to go, the repair team at the DPW is ready to celebrate.  "Though [[Storm of the Century Hits Caprica|that storm]] a while back slowed us down by a good month or so, we're finally in the home stretch," said longtime DPW worker Jonas Malkas.   


Well I, for one, am looking forward to enjoying the fruits of their labor (and our tax cubits).  Let us know what you think about fancy new Colonial 5 after you've taken it for a test drive!  Sound off in the comments below.
Well I, for one, am looking forward to enjoying the fruits of their labor (and our tax cubits).  Let us know what you think about fancy new Colonial 5 after you've taken it for a test drive!  Sound off in the comments below.

To edit this page, please enter the words that appear below in the box (more info):

Refresh
Cancel Editing help (opens in new window)

  [] · [[]] · [[|]] · {{}} · · “” ‘’ «» ‹› „“ ‚‘ · ~ | °   · ± × ÷ ² ³ ½ · §
     [[Category:]] · [[:File:]] · [[Special:MyLanguage/]] · <code></code> · <nowiki></nowiki> <code><nowiki></nowiki></code> · <syntaxhighlight></syntaxhighlight> · <includeonly></includeonly> · <noinclude></noinclude> · #REDIRECT[[]] · <translate></translate> · <languages/> · {{#translation:}} · <tvar|></> · {{DEFAULTSORT:}} · <categorytree></categorytree> · <div style="clear:both;"></div> <s></s>


Your changes will be visible immediately.
  • For testing, please use the sandbox instead.
  • On talk pages, please sign your comment by typing four tildes (~~~~).